Back to Course
SM-EI Safety Awareness
0% Complete
0/0 Steps
-
Safety Awareness for Utility Arboriculture Work1 Quiz
-
Safety Awareness for Overhead Line Work1 Quiz
-
Safety Awareness for Excavation and Cable Laying1 Quiz
-
Safety Awareness for Underground Cable Work1 Quiz
-
Safety Awareness for Building Maintenance Work1 Quiz
-
Safety Awareness for Power Systems Electrical Work1 Quiz
-
Safety Awareness for Industrial Chemical Work1 Quiz
-
Safety Awareness for Industrial Fabrication Work1 Quiz
Your work scenario
A new overhead line is required to replace a section of existing line. Part of the line follows the road corridor with a pedestrian pathway under a row of trees. You are part of the work party responsible for stringing the new line. Trees have been trimmed along the road corridor and the line is planned to be de-energised as part of the required work.
Time limit: 0
Quiz Summary
0 of 10 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Quiz complete. Results are being recorded.
Results
0 of 10 Questions answered correctly
Your time:
Time has elapsed
Categories
- Safety Awareness 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Current
- Review
- Answered
- Correct
- Incorrect