  • Bill Doig

    Member
    20 June 2022 at 3:02 pm

    I’m with Steven. We don’t have any SWP’s around solar but do have a register of solar sites and our smart meters can corelate if we’ve got sites exporting who aren’t on the register. Solar sites I think appear in the work pack so field staff can isolate the main switch if they desire. Changing conductors mandates turning the main switch off anyway. Seems everyone is playing ball on our network with solar compliance