SM-EI Safety Equipment
-
Safety Equipment for Utility Arboriculture Work1 Quiz
-
Safety Equipment for Overhead Line Work1 Quiz
-
Safety Equipment for Excavation and Cable Laying1 Quiz
-
Safety Equipment for Underground Cable Work1 Quiz
-
Safety Equipment for Building Maintenance Work1 Quiz
-
Safety Equipment for Power Systems Electrical Work1 Quiz
-
Safety Equipment for Industrial Chemical Work1 Quiz
-
Safety Equipment for Industrial Fabrication Work1 Quiz
Your work scenario
A new overhead line is required to replace an existing line to increase capacity for a semi-rural industrial area. The first section of line follows the road corridor which includes a pedestrian pathway under mature trees, and the second section cuts through a privately-owned farm. You are scheduled to be a member of one of two work parties responsible for stringing the new line. Trees have been trimmed along the road corridor section and the line is planned to be de-energised as part of the required work. The weather forecast indicates a high temperature and strong winds are to be expected.
Quiz Summary
0 of 10 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 10 Questions answered correctly
Your time:
Time has elapsed
Categories
- Safety Equipment 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Current
- Review
- Answered
- Correct
- Incorrect