Back to Course
SM-EI Safety Equipment
0% Complete
0/0 Steps
-
Safety Equipment for Utility Arboriculture Work1 Quiz
-
Safety Equipment for Overhead Line Work1 Quiz
-
Safety Equipment for Excavation and Cable Laying1 Quiz
-
Safety Equipment for Underground Cable Work1 Quiz
-
Safety Equipment for Building Maintenance Work1 Quiz
-
Safety Equipment for Power Systems Electrical Work1 Quiz
-
Safety Equipment for Industrial Chemical Work1 Quiz
-
Safety Equipment for Industrial Fabrication Work1 Quiz
Your work scenario
A new subdivision is planned, and the existing overhead system is to be diverted underground for amenity reasons. You are part of the work party responsible for connecting the new cable to the overhead system. The cable has been laid along the road corridor, the trench has largely been filled, and the system will be de-energised.
Time limit: 0
Quiz Summary
0 of 10 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Quiz complete. Results are being recorded.
Results
0 of 10 Questions answered correctly
Your time:
Time has elapsed
Categories
- Safety Equipment 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Current
- Review
- Answered
- Correct
- Incorrect