Your work scenario
A new overhead line is required to replace a section of existing line. Part of the line follows the road corridor which includes a pedestrian pathway under mature trees. Your company has been asked to trim the trees before the conductor replacement occurs. You are required to assist with this work, while the overhead line is live, before the planned outage and replacement work is carried out.
Time limit: 0
Quiz Summary
0 of 10 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Quiz complete. Results are being recorded.
Results
0 of 10 Questions answered correctly
Your time:
Time has elapsed
Categories
- Safety Measures 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Current
- Review
- Answered
- Correct
- Incorrect