    Thanks Bryce, I note this is for service connecitons.
    Do you have anything for Network polarity, as in pre livening tests on network to network connections.
    For example, crew replace ground mount TX, with 5 circuits attached, how do you electrically ensure:
    1) each circuit neutral is connected pre livening

    2) each neutral is actually connected to the main neutral (polarity)

    Same question applies to mainline take off network connections , example being car v pole, power off and connecitons on the mainline are broken and remade.