Engineering and Technical
Export Limit Assessment Methodology (ELAM) and Bespoke Export Limit Assessment Methodology (BELAM): National Framework Guideline
Note: File may be downloaded after completion of your purchase
2026
This Guide provides a nationally consistent engineering framework for assessing export limits for distributed generation (DG) under the Export Limit Assessment Methodology (ELAM) and Bespoke Export Limit Assessment Methodology (BELAM). It supports implementation of Part 6 of the Electricity Industry Participation Code (Code), including mandatory use of the specified methodologies from 11 November 2026 and the replacement distributed-generation connection framework applying from 1 December 2026.
This Guide has been developed collaboratively by the Electricity Engineers’ Association (EEA) and the Electricity Authority (EA), with input from electricity distribution businesses and other industry stakeholders. It forms part of the wider work to streamline and improve electricity connection processes in New Zealand and provides a common industry framework for the engineering assessment of export limits.
ELAM provides a standardised and repeatable basis for the network studies specified by the Code. BELAM provides an application-specific methodology for bespoke network studies where required. Both use the common engineering framework in this Guide, with assessment depth proportionate to the connection, available data, network conditions and potential impact.
As an industry implementation approach, ELAM is expected to be the primary assessment method for routine small-scale connections, particularly at 10 kW or less. For connections above 10 kW and below 300 kW, assessment should remain proportionate: an established ELAM or network-wide assessment may provide relevant inputs, with BELAM used where the Code requires a bespoke network study or where an application-specific assessment is otherwise needed. For connections of 300 kW or more, BELAM is expected to be the normal industry assessment approach, while allowing relevant information from an existing ELAM or other validated network study to be reused where appropriate. These expectations do not alter the applicable Code process or the circumstances in which a particular methodology is mandatory.
The Guide establishes common expectations for input data, network scenarios, coincident demand, voltage and thermal assessment, protection and power-quality screening, treatment of uncertainty, identification of the binding constraint, and recording and communication of the export outcome. It standardises the engineering parameters, decision points and minimum outputs rather than prescribing a single national calculation method, model or software platform.
The objective is greater national consistency, transparency and predictability, while retaining proportionate engineering discretion and enabling DG to export to the greatest extent reasonably supported by network capability, safety, reliability and the Code. This supports efficient use of network capacity for the long-term benefit of consumers, including households, community energy participants and other distributed generators.